200-Amp Service Upgrade for Heat Pump + EV Charger — Abbotsford
A 100-amp service that couldn't support a new heat pump and EV charger. Full 200-amp upgrade — new meter base, Schneider Electric Homeline panel, and dedicated circuits — with same-day BC Hydro disconnect and reconnect.

A homeowner wanted to install a new heat pump and EV charger, but their existing 100-amp electrical service did not have enough capacity to support both additions. They contacted ElectroMax Systems for a solution.
After completing a site assessment, we recommended upgrading the electrical service to 200 amps, including a new meter base, electrical panel, and associated service equipment to meet applicable electrical code requirements. ElectroMax Systems handled the electrical permit through Technical Safety BC and coordinated the service upgrade with BC Hydro — arranging for disconnection and reconnection on the same day to keep the interruption to the customer's power supply as short as possible. Our team installed a new meter base and a Schneider Electric Homeline panel, with new breakers for the existing household circuits and dedicated circuits for the new heat pump and EV charger.
The installation passed its final electrical inspection. The customer can now enjoy their heat pump and EV charger without the main breaker tripping due to overloading. ElectroMax Systems managed the assessment, permit, utility coordination, installation, and inspection — making the upgrade straightforward for the homeowner.
Progress photos.